Things are still busy and will be for the next few weeks, month, some period of time that will perhaps never let up.
The premature spring followed by the belated winter has messed with my head, but the extended daylight makes things a bit more correct again.
A small herd of deer has taken a fancy to the yard.
The dog absolutely does not fancy them.
He starts a new class for complicated dogs next week – fingers crossed he’ll soon learn to cope with other four-legged, or rather, all, creatures soon.
Fiber-wise, I’m still finishing up several things and resisting the temptation to start anything new.
I’ve started the garden seeds, and N has started to break up the concrete walks to nowhere in the yard.
It’s sucky work, but he’s an ace with a sledgehammer and we’re saving a good chunk of money on the deconstruction.
We need a helluva lot of plants – ones not delectable to deer – but I’m happy to reduce the lawn as much as possible.
The bathroom reno is finally starting, well, scheduled.
After looking at hundreds of tiles, various solid shower wall options, and green resilient flooring, we settled in our comfort zone – all tile, tiles we’ve used before, ones that are very affordable, and fit into the vintage cottage vibe going on in the house already.
First we have a bit of an emergency with having to replace the basement sewer line though… a rather shitty situation.